Post season bits
Page 1 of 1
Post season bits
Hi All,
Was a bit busy this time off prospecting, before christmas completed shell of boat welding outside ready for buoyancy foam and welding of chequered floor plates when i've finished prospecting this season, also finished welding of gunnals and anchor well
Also got sick of using handpump to raise top half of caravan every time we pull up as it took 65 pumps to 120 pumps depending on how the pump felt at the time so fitted one vof these
Then the missus complained about the fridge slide so had to build one of these
So new tyres on van and start packing on sunday
Cheers, Ron Sherri and Yoda
Was a bit busy this time off prospecting, before christmas completed shell of boat welding outside ready for buoyancy foam and welding of chequered floor plates when i've finished prospecting this season, also finished welding of gunnals and anchor well
Also got sick of using handpump to raise top half of caravan every time we pull up as it took 65 pumps to 120 pumps depending on how the pump felt at the time so fitted one vof these
Then the missus complained about the fridge slide so had to build one of these
So new tyres on van and start packing on sunday
Cheers, Ron Sherri and Yoda
Flouro
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|